How to Complain About a Solar Installer UK (MCS, RECC)

By Sepehr· 23/11/2026· Updated 23/11/2026· 5 min read
How to Complain About a Solar Installer UK (MCS, RECC)

Written and reviewed by Sepehr. See our editorial policy.

If something goes wrong with an MCS-certified solar installation, MCS says to complain to your installer first, then escalate to MCS, and only then, if still unresolved, to independent dispute resolution. This guide walks through those steps using MCS’s consumer complaints page and the Renewable Energy Consumer Code (RECC) consumer support page, and flags which route depends on when and with whom you signed your contract. It is not legal advice. For prevention, see our guide to questions to ask a solar installer.

Step 1: complain to your installer

MCS says: “If you notice a problem, you should contact your installer first.” It suggests you explain what the problem is and what you would like to happen. RECC says to raise your complaint with your installer in writing first, so writing is the safer habit, and keep copies. MCS says 14 days is a reasonable maximum time to expect a response. The installer may not be able to fix everything in that time, but should at least have agreed a plan of action with you.

Step 2: escalate to MCS

If your installer does not resolve the issue, you can escalate it to MCS, which describes itself as the single point of contact for complaints about MCS-certified installers or installations. You can complain by online form, email, post, phone or live chat, and MCS can accept a complaint from a third party acting on your behalf once it has verified this with you. MCS says it will need:

  • details of what went wrong;
  • photographic evidence;
  • supporting documents such as contracts or quotes;
  • what you would like to happen; and
  • your willingness to engage in the process and allow the installer access to remedy the problem.

MCS says it will acknowledge your complaint within 5 working days, update you at least every 10 working days, and that most complaints should be fully resolved within 8 weeks. It may carry out a technical review of your installation if needed, and sends a written outcome with its decision and reasoning. Your installer, their certification body and consumer code (if any) are kept informed. MCS says you can instead go directly to a certification body or consumer code, but encourages starting with MCS.

Step 3: independent dispute resolution

If you are unhappy with the outcome, the complaint may become a dispute. MCS says it is not accredited to offer dispute resolution itself. For eligible disputes, alternative dispute resolution (ADR) is free and funded by MCS, and MCS names the Dispute Resolution Ombudsman, operating as the Furniture & Home Improvement Ombudsman, as its ADR partner. MCS lists the conditions for going to ADR, within 12 months of MCS concluding the complaint, including:

  • you have completed the MCS process and remain dissatisfied;
  • you or your installer disagree with the proposed resolution;
  • your complaint to MCS has not been resolved within 12 weeks;
  • your contract was entered into under the redeveloped installer scheme.

MCS also says ADR for contracts under the original scheme from 1 January 2025 depends on the installer confirming in writing that it will engage in ADR. For contracts entered into before 1 January 2025, ADR can still be reached through the installer’s consumer code, RECC or HIES.

What if your installer is a RECC member?

RECC says its consumer protection and ADR process “only applies to RECC members and eligible contracts”, and that if the contract was entered into while the business was a member, you may still be able to use Green Homes Dispute Resolutions after it has stopped being one. Check whether your installer is a member of RECC or HIES, and which code applies, before you choose a route. The RECC pages we could read did not set out time limits or what the process can award, so check those directly with RECC.

What about guarantees and financial protection?

MCS says that for domestic installations an insurance-backed guarantee is required under the original scheme, and that installers must guarantee workmanship for a minimum of two years. It states that MCS-approved financial protection products will replace these as mandatory under the redeveloped scheme, with “at least six years’ cover from the installation date” and a “capped excess at £250”. Our guide to insurance-backed guarantees covers the change, and what to do if your installer goes bust covers that case.

Practical checklist

  • Keep your contract, quote, MCS certificate and guarantee paperwork. See our MCS certificate guide.
  • Photograph the fault and note dates.
  • Complain to the installer in writing, say what you want, and diarise 14 days.
  • Escalate to MCS if unresolved, and check which consumer code the installer belongs to.
  • Note the dates for ADR, including the 12-month limit.

Terms and processes change, so confirm current details on the MCS and RECC websites. If you are choosing an installer, see how to choose a solar installer.

FAQs

Who do I complain to about a solar installer?

MCS says to contact your installer first, in writing if you can, and then escalate to MCS if the issue is not resolved. MCS says it is the single point of contact for complaints about MCS-certified installers and installations.

How long should an installer take to respond?

MCS says 14 days is a reasonable maximum time to expect a response. It may not be possible to fully resolve the issue in that time, but the installer should at least have agreed a plan of action with you.

How long does an MCS complaint take?

MCS says it acknowledges a complaint within 5 working days, updates you at least every 10 working days, and that most complaints should be fully resolved within 8 weeks.

Is dispute resolution free?

MCS says that for eligible disputes ADR is free and funded by MCS. Eligibility depends on when your contract was signed and under which scheme.

What if my installer is a RECC member?

RECC says its ADR process applies to its members and eligible contracts. You should raise the complaint with the installer in writing first, and you may be able to take it to Green Homes Dispute Resolutions.

Is there a time limit for ADR?

MCS says you can escalate to ADR within 12 months of the complaint being concluded by MCS. Check RECC or HIES directly for any limits on their own routes.

Sources — verified 23 November 2026

  1. MCS, “What to do if things go wrong” — mcscertified.com
  2. RECC, “Consumer support” — www.recc.org.uk
  3. MCS, “Insurance-backed guarantee products” — mcscertified.com
  4. MCS, “Financial protection (redeveloped installer scheme)” — mcscertified.com
Sepehr, solar specialist at Smart Solar Homes

About the author

Sepehr

Solar specialist & co-founder, Smart Solar Homes

Solar specialist and co-founder of Smart Solar Homes, which works with MCS-certified UK installer partners. I write all the guides and reviews here; the aim is straight-talking education the industry rarely provides.

Citing this page? Please use a dofollow link back to the original article — it helps us keep the data on this page accurate and up to date.

Browse Solar Panels on Smart Solar Homes

Want to compare these side by side? Use the compare tool →

Or browse all Solar Panels on Smart Solar Homes.

Related reading

More on solar panels from the editorial team.

Find installers near you

MCS-certified solar installers covering these areas.